Artit wiwatwisansakul
May 28, 2026
Rayong

This course is designed to provide engineers with a comprehensive understanding of the fundamental design principles and operational considerations for steam systems (excluding boiler internals) and cooling water systems in industrial plants.
Participants will learn key components, control strategies, efficiency considerations, and common troubleshooting issues. The course emphasizes practical design criteria, system balancing, piping considerations, and chemical treatment in cooling towers, enabling attendees to apply this knowledge directly to improve system performance and reliability.
Process engineer / Senior process engineers / Operation Engineers
8:00 AM – 9:00 AM Register
9:00 AM – 12:00 PM
• Overview of Steam Generation System
• Steam generation cycle (Typical Scheme)
• Typical steam condition
• Steam pressure level
• Steam System Control
• High pressure control
• Medium pressure control
• Low pressure control
• Letdown valves
• Overpressure protection
• Steam Balance
• Steam Turbine
• Configuration
• Back pressure turbine
• Condensing turbine
• Extraction turbine
• Boiler Feed Water System
• Boiler feed water pump
• Design consideration
• Pump protection
• BFW preheaters
• Deaerator
• Deaerator relief valve
12:00 PM – 13:00 PM Lunch Break
13:00 PM – 17:00 PM
• Desuperheaters and Letdown Station
• Application and desuperheater types
• Design consideration
• Letdown desuperheater control
• De-superheating water
• Condensate Systems
• Condensate clean-up and treating
• Steam System Piping
• Line sizing criteria
• Steam tracing
• Steam blowing
• Piping general requirements
• Thermal Efficiency and Heat Rate
• Overall Efficiency
8:00 AM – 9:00 AM Register
9:00 AM – 12:00 PM
• Cooling Tower Introduction
• Types of cooling tower system
• Once through system
• Recirculating system
• Mechanical draft tower
• Atmospheric tower
• Natural draft tower
• Material Balance
• Evaporation loss
• Windage loss
• Cycle of concentrations
• Chemical Treatment
• Water analysis
• Saturation and stability index
• Chemical dosage
12:00 PM – 13:00 PM Lunch Break
13:00 PM – 17:00 PM
• Design Criteria
• General consideration for sizing
• Water circulating flowrate
• Approach wet bulb temperature
• Cooling range
• Auxiliary Equipment
• Circulating pump
• Corrosion inhibitor
• Sulfuric acid injection
• Instrumentation requirement
• Cooling Tower problems
• Water contaminants
• Scale
• Tower and cooling circuit corrosion
• Microbiological growth
• Fire hazard
• Cleaning
Process Safety Engineering
Process engineering and chemical engineering
Plant problem solving and training
For UPCOMING Public Training Course with ChemEngEdu
Early-Bird Rate for Corporate Participants: 5% discount fromfull price for registration at least 4 weeks (28 days) before the training date(reserve the early-bird rate by registration, not by payment).
Individual Participant Promotion: -50% OFF from full price(max 1 person per organization per course). Not eligible for early-bird rateabove.
Academic Participant Promotion: -40% OFF from full price(max 1 person per organization per course). Not eligible for early-bird rateabove.
SkillLane Participant Promotion: Get 60% OFF the full priceon a CEE course when you register for any SkillLane course. (Offer valid for 1SkillLane course per 1 CEE course.)
Note: Please submit proof of your SkillLane registration toqualify for the discount when signing up.






เราใช้คุกกี้เพื่อพัฒนาประสิทธิภาพ และประสบการณ์ที่ดีในการใช้เว็บไซต์ของคุณ คุณสามารถศึกษารายละเอียดได้ที่ นโยบายความเป็นส่วนตัว และสามารถจัดการความเป็นส่วนตัวเองได้ของคุณได้เองโดยคลิกที่ ตั้งค่า